Parts, Technical
Locating Tang Tool
Perkins being such innovators and market leaders will be removing locating Tangs on their range of big end bearings. Also at the same time are making lead free bearings.
Beware you will require the locating tool required click here for the tool
Perkins Parts Bulletin
Perkins Engines Company Limited, Peterborough, PE1 5NA, UK.
PMB 812 (September 2009)
Bearing Rationalisation and Material Change
Perkins is pleased to announce some new changes to our bearing kits as part of our commitment to continuous product improvement. This includes a rationalization of kits to simplify the offering, along with a change of material to eliminate lead content. Kits have been rationalized to the highest specification kit available. Other changes include the removal of the fitting tool, previously part of all tangless bearing kits. This is now available separately as part number 27610233
Contents and specification
This product restructuring and material change have allowed us to introduce both a rationalized, easier to understand the range of bearing kits.
Changes
Tang to Tangless – To allow more complete rationalization of the range and therefore maximum simplicity, Perkins will now be servicing tanged con rods with tangless bearings. There are no detrimental effects on the performance of the engine or the location of the bearing by making this change.
Fitting tool – The fitting tool which was previously supplied with all kits of tangless bearings will now be available as a separate part number (27610233).
Material change – Perkins has worked hard to eliminate lead from our bearing range due to its environmental impact. The reviewed bearing range is entirely lead-free, excluding kits 85042 and 85043, making it more environmentally friendly. The new material is, as a consequence of being lead-free, of a higher specification than the current material but you may notice a slight change in colour, please see the below pictures for an example.
Availability
The lead-free kits will be introduced over the coming months by supersession.